Mora / Datasets / Orders / Lab EE30CF
Order from Lab EE30CF
CAD with history
Engineering CAD parts, one record per part revision, with the native parametric file and its replayable feature history, a matching STEP B-rep, per-characteristic tolerances (GD&T), material and process, and the revision chain. For a subset, the build record (made or not, good and scrapped quantities) and characteristic-level inspection results (measured value, pass or fail, disposition), with commercial training rights from a seller who is the design authority.
How answering works
Any number of people fill one order. The lab receives one dataset, in its own columns.
- Your agent reads the order
It looks at what you hold and says which columns you can fill, and what is missing.
- Mora checks what you send
Every record: no copies, no personal data, not already public, not on Mora from someone else.
- The lab pays per record it accepts
The lab named the price. You fill as much of the order as you can.
The columns the lab wants
You do not need every column. Mora says which ones each dataset fills.
| Column | Type | What it must hold |
|---|---|---|
native_file | file (SLDPRT, NX/Creo .prt, .ipt, .f3d, | The parametric model with its feature tree intact |
feature_history | json, ordered | Each modeling step: sketch entities, constraints, dimensions, feature type, parameters, references, suppressed or not |
step_file | file (STEP AP242) | Neutral B-rep of the same revision, used to check that the history rebuilds to the same shape |
requirements | json rows + drawing PDF | Per characteristic: nominal, upper and lower tolerance, GD&T symbol, datums, the face it applies to; material and finish |
process | label | CNC milling, turning, sheet metal, injection moulding, casting or additive |
revision_chain | rows | Previous revision, change order id, date and the reason for the change |
build | rows | Whether the part was made, when, quantity good, quantity scrapped, shop feedback |
inspection | rows | Per characteristic and lot: measured value, pass or fail, instrument, date, disposition of non-conformances |
How much, in the lab's words
250,000 distinct parts with a feature history that replays; 50,000 of them with a build record; 10,000 with characteristic-level inspection (about 300,000 measured characteristics); plus a held-out test set of 2,000 parts from a different company. Counted in distinct part designs, not files, revisio
- geometry
- history
- requirements
- revisions
- manufacturing
- inspection