Mora / Datasets / Orders / Lab 7C33ED

Order from Lab 7C33ED

Trades before after

Before and after photos of electrical panels and plumbing installations taken by tradespeople on real jobs, with what was done and the inspector's decision (pass, fail, the code section cited, and the correction when it failed). We need original camera files, paired by job and site, with a result that comes from the inspecting authority and not from the seller.

How answering works

Any number of people fill one order. The lab receives one dataset, in its own columns.

  1. Your agent reads the order

    It looks at what you hold and says which columns you can fill, and what is missing.

  2. Mora checks what you send

    Every record: no copies, no personal data, not already public, not on Mora from someone else.

  3. The lab pays per record it accepts

    The lab named the price. You fill as much of the order as you can.

The columns the lab wants

You do not need every column. Mora says which ones each dataset fills.

ColumnTypeWhat it must hold
job_ididOne installation at one site; the unit we count and pay for
site_ididHashed address, so the same installation is not counted twice
tradelabelelectrical or plumbing
work_typelabelPanel swap, service upgrade, subpanel, rough-in, water heater and so on
photoimageOriginal camera file, JPEG or HEIC, 2,000 px or more on the long side
stagelabelbefore, during, after, or correction
captured_atdatetimeWhen the photo was taken, from the device
device_modeltextThe phone or camera that took it
work_donetextWhat the tradesperson did, in their own words
equipment_maketextPanel brand and amperage, or pipe material
inspection_resultlabelpass, fail or partial
failed_itemslistFor each failure, the code section cited and the defect
result_sourcelabelThe inspecting authority's record, or the contractor's own note
authoritytextWhich jurisdiction inspected
code_editiontextNEC 2020, NEC 2023, IPC, UPC
permit_ididHashed permit number, checkable against public permit records
technician_ididWho did the work and took the photo, as a generated id
reinspection_ofidLinks a correction and its re-inspection to the failed inspection

How much, in the lab's words

60,000 inspected jobs (about 250,000 photos), of which at least 9,000 failed at first inspection with the correction photo and re-inspection; at least 300 technicians, 40 inspecting authorities and 25 panel brands; 70% electrical, 30% plumbing

  • jobs
  • photos
  • inspection
  • corrections
  • annotations